Installation & Commissioninc
International standard
GMP has own engineering team, furthermore, all other engineering team and installation eam's cooperation Is welcomed. On request, GMP is capable of despatching the supervisor to ensure the right working way. the guideline and the lntemational standard to meet the requrement of :
  ---GMP&CGMP
  ---ISO 9000:2000/14644
  ---WHO
  ---FDA
  ---ECA
  ---ISPE
  ---DIN I ¡¢II& III
In time, in budge
Cleanroom project is mostly part of a wider project. Coordination with different disciplines is needed and time schedule should be match. GMP guarantee the installation and commissioning schedule to be in time and in budget. The guarantee can be given because of the full cycle of design, own manufacturing and installation under professional controlling.

Commissioning and Testing

As part of the validation process the testing and commissioning of clean rooms and HVAC should be executed and well documented. GMP design and installation are prepared for proper commissioning and subsequent maintenance and checking. It will accommodate the validation cycte and to help the GMP audit committee for their approval.